Interstate 25 and Interstate 40 Bridge Rehabilitation Project

Scope: The NMDOT is rehabilitating I-25 and  I-40 Bridges in the Albuquerque Metro Area. Rehabilitation will be deck repairs and epoxy overlays. Bridges include:

  • I-40 westbound  ramp bridge to I-25 Southbound Bridge over northbound frontage road
  • I-25 bridges over Lomas Blvd.
  • I-25 bridges over Mountain Road
  • I-25 southbound bridge over Central Ave.
  • I-40 bridges over northbound frontage roads

Construction rehabilitation will be weekends during summer 2017.

Approximate Cost: $812,812
Anticipated Start Date: June 2017
Expected Completion Date: November 2017

Project Sponsor:
NMDOT Jeremy Maestas, Project Manager (505) 798-6674 jeremy.maestas@state.nm.us

Contractor:

The Truesdell Corporation
1310 West 23rd Street, Tempe, AZ 85282
(602) 437-1711


Interstate 25 at Rio Bravo Interchange Project

Scope: The NMDOT is reconstructing the I-25 and Rio Bravo Interchange and the Rio Bravo roadway corridor from University to the AMAFCA channel. Improvements will include a new intersection layout at I-25/Rio Bravo and new roadway pavement and features within the right-of-way infrastructure including Multi-modal improvements.

Approximate Cost: TBD
Anticipated Start Date: TBD Project Bidding March 2017
Expected Completion Date: TBD

Project Sponsor:
NMDOT Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
To be determined.


NM 6 Roadway Improvements Project West of Los Lunas

Scope: The New Mexico Department of Transportation (NMDOT) is reconstructing the NM 6 roadway corridor from MP 18.531 to MP 23.636. Improvements will include new pavement cross-section in addition to miscellaneous construction within the right-of-way including drainage and driveway improvements.

Approximate Cost: $5.12 million
Anticipated Start Date:  June 2016
Expected Completion Date: June 2017

Project Sponsor: 
NMDOT
Patsy Najar, Project Manager (505) 798-6783  Patsy.Najar@state.nm.us

Contractor:

Mountain States Constructors, Inc.
3601 Pan American Freeway NE Suite 111
Albuquerque, NM 87107
(505) 292-0108


I-25 South corridor study

The New Mexico Department of Transportation (NMDOT) in cooperation with the Federal Highway Administration (FHWA) is conducting an engineering study for the South I-25 Corridor from the NM 47/Broadway Interchange to the I-40/I-25 Interchange.

Project Purpose:

The objective of the study is to identify transportation needs in the corridor and to develop a priority plan that will enable the NMDOT to program funds for both near and long term projects.

Public Meetings:

The team offers the public updates on the status of the study and the findings of the detailed analysis at public meetings. The team seeks comments from the public as part of the evaluation of the alternatives prior to deciding on a preferred improvement alternative for the corridor.

If you have questions about the study please contact:

• Bernadette Bell, NMDOT Public Information Officer at (505) 798-6645, bernadette.bell@state.nm.us; or

• Mark Fahey, NMDOT Project Manager at (505) 798-6717 Mark.Fahey@state.nm.us

Or comments and/or questions specific to this study may be sent to:

Attn: South I-25 Corridor Study

WSP | Parsons Brinckerhoff
6100 Uptown Boulevard NE, Suite 700
Albuquerque, NM 87110
Or email your comments to: wagnercs@pbworld.com.

To request Americans with Disabilities Act (ADA) accommodations for public meetings, please contact Cheryl Wagner with Parsons Brinckerhoff at least two days prior. See meeting schedule in ‘documents’ section.


0