Project Complete
I-10/I-25 Re-Construct Systems Interchange
CN-LC00060
Scope: The scope of this project includes replacement of two load limited bridges (referred to as the “twin bridges“) along I-10 to meet current design standards, removing and reconstructing the I-10/I-25 ramps, removing and replacing with CBC the I-25 bridge over the Fillmore arroyo, realigning the Las Alturas and Stern Road frontage roads, continue the I-10 third lane up to the Twin Bridges, pavement reconstruction on I-10 and I-25 and sound wall construction (per Environmental Commitments). Drainage improvements throughout the project will be constructed to allow for proper flow of water and pavement improvements will include removal of existing concrete pavement and replacing with asphalt.
Project Details
- I-10/I-25 Interchange Project Overview
- Anticipated Schedule
- Detail Video (Download Format: .wmv 14MB)
Contact:
Bridget Spedalieri, NMDOT Public Information Officer 575-525-7340
Contractor:
A.S. Horner, Inc.
P.O. Box 46185, Rio Rancho, NM 87174
(505) 873-1577
Project Start Date: April 2012
Project Compleate Date: April 2013
Project Cost: 36.6 Million
Location: Dona Ana County