NMDOT Road Construction and Study Projects
Projects by Districts
District 1
Please Click the link above for more information on the projects listed below.
- I-10/I-25 Re-Construct Systems Interchange
- I-10 Roadway Rehabilitation
- I-10 Motel Blvd exit New Bridge and Ramps I-10/NM22 Interchange
- I-10 Avenida de Mesilla
- I-25 Roadway Rehabilitation
- I-25 Safety, Metal Barrier Installation
- I-25/Alamosa Creek Bridge Replacement and Roadway Reconstruction
- US-70 Cable Barrier
- US 70 Wildlife Crossing Study
- US 70 Roadway Rehabilitation
- US 70/North Main St. Imporvement Project -Environmental Assessment
- US-180 Roadway Rehabilitation
- NM 90/Hudson Street Replacement Project
- NM-136/NM-273 Roadway Rehabilitation
- Cambray Bridge Replacement
- Strauss Roadway/Doña Ana County Road
District 2
Please Click the link above for more information on the projects listed below.
- NM 206 - Pavement Rehabilitation
- NM 176 - Pavement Rehabilitation
- NM 18 - Pavement Rehabilitation
- US 70 - Reconstruction
- US 62 - Urban Reconstruction
- District Wide Crack Seal
- US 54 - Reconstruction - Village of Corona
- US 54 - Reconstruction - Lincoln County
- US 54 - Reconstruction - North of Tularosa
- US 54 - Reconstruction RR Overpass
District 3
Please Click the link above for more information on the projects listed below.

- NM 528 Pat D’Arco Highway Improvement Project
- NM 47 Peralta Roadway Improvements Project
- I-40 Rio Puerco Interchange to Nine Mile Hill
- I-25, Comanche to Jefferson
- NM 6, between I-25 and NM 314
- NM 313, Sandia Pueblo to U.S. 550
- I-25, U.S. 550 to Algodones
- I-40 and Rio Puerco
- U.S. 60
- I-25/US 550 Interchange Reconstruction Project
District 4
Please Click the link above for more information on the projects listed below.
- US 54 Canadian Bridge Alignment Study
- US 54, MP 305 – MP 327 Safety
- I-40 MP 362 - MP 368 Roadway Rehabilitation
- I-40/US 54 Interchange Lighting
- I-40 MP 355 – MP 359.5 Roadway Rehabilitation
- I-40 MP 340.65 – MP 345 Roadway Rehabilitation
- I-25 MP 451.666 – MP 453.995 Roadway Reconstruction
- I-25 MP 459.50 – MP 460.615 Roadway Rehabilitation
- Raton Patrol Yard – Salt Storage Facility
- US 64 MP 296 – MP 305 Roadway Rehabilitation
- NM 421 MP 8 – MP 8.20 Roadway Reconstruction
- I-40 MP 255.38 – MP 263 Roadway Rehabilitation
- US 64 MP 281.8 – MP 285 Roadway Reconstruction
- NM 63 MP 1.492 – MP 1.528 and MP 4.734 – MP 4.770 National Park Service Pecos, NM
- I-25 MP 343.50 – MP 348.50
District 5
Please Click the link above for more information on the projects listed below.
- US 84/285 Pojoaque Interchange
- NM 475 Proposal to improve NM 475 along Paseo de Peralta
- US 64 Roadway Reconstruction City of Bloomfield
- US 64 Roadway Reconstruction near Lumberton
- US 64 Farmington to Bloomfield
- I-25 St. Francis Drive Bridge Rehabilitation
- I-25 - NM 14 (Cerrillos Road) Interchange Study
- I-25 Canoncito Interchange Study
- US 64 & NM 68 Taos Congestion Relief Project Study
- I-25 Corridor Study (NM 599 – NM 466 Old Pecos Trail)
- US 84 St. Francis Corridor Study
- I-40 Corridor Study (Sedillo to Moriarty)
- NM 30 Corridor Study & NM 502 –US 84/285 Alternatives
- NM 41 (Clark Hill to US 285) Project Study
- NM 68 Velarde to Horseshoe Curve Study
- NM 599 and CR 62 New Interchange Construction
District 6
- I-40 Roadway Reconstruction (CN 6100570R)
- I-40, Safety Metal Barrier Installation (CN 6100162)
- I-40, Roadway Rehabilitation (CN 6C00001)
- I-40, Bridge Rehabilitation (CN 6100490)
- US 491, Roadway New Construction (CN ESB5B56)
- I-40, Roadway Reconstruction (CN D6111)
- I-40, Roadway Rehabilitation (CN 6100713)
- Various Locations in District Six, Stockpiling
- I-40, Roadway Rehabilitation (CN 6100714)
- I-40, Roadway Rehabilitation (CN 6100711)
- NM 12, Bridge Replacement (CN 6100530)
- I-40, Roadway Rehabilitation (CN 6100560)