I-40, Bridge Preservation Project
Milepost 160.39 to 167.5, .285 miles (A300696)
Scope: The New Mexico Department of Transportation (NMDOT) is performing bridge preservation work on nine bridges on the Interstate system as well as bridges located over I-40. 
Bridge Locations:
I -40 over Tramway Boulevard
I-40 over Diversion Channels
Carlisle Bridge over I-40 and Embudo Channel
Washington Bridge over I –40
San Pedro Bridge over I-40

Approximate Cost: $1.1 million
Anticipated Start Date:  April 2016
Expected Completion Date: Summer 2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674 jeremy.maestas@state.nm.us

Contractor:
RAM Construction Services of Michigan
13800 Eckles Rd, Livonia, MI 48150
(734) 464-3800
www.ramservices.com


I-25 and I-40 Bridge Preservation Project
I-25 Milepost 224.9 to 226.28 and I-40 at milepost 159.7 for 0.573 miles (A300697)
Scope:
The New Mexico Department of Transportation (NMDOT) is performing bridge preservation work on nine bridges on the Interstate system. 
Bridge Locations:
I 25 SB off ramp to I -40 EB ramp over University Boulevard
I-40 over University Boulevard
I-40 WB to I-25 Over University Boulevard
I-25 NB off ramp to Lomas Boulevard exit 225
I-25 SB/NB over Menaul Boulevard
I-25 off-ramp over NB and EB Frontage road
I-40 WB off ramp to I-25 NB over Frontage Road

Approximate Cost: $978,978.00
Anticipated Start Date:  Summer 2016
Expected Completion Date: Fall 2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674 jeremy.maestas@state.nm.us

Contractor:
Truesdell Corporation of Tempe, AZ
1310 W. 23rd Street
Tempe, AZ 85282


NM 6 Roadway Improvements Project West of Los Lunas

Scope: The New Mexico Department of Transportation (NMDOT) is reconstructing the NM 6 roadway corridor from MP 18.531 to MP 23.636. Improvements will include new pavement cross-section in addition to miscellaneous construction within the right-of-way including drainage and driveway improvements.

Approximate Cost: $5.12 million
Anticipated Start Date:  June 2016
Expected Completion Date: Winter 2016

Project Sponsor: 
NMDOT
Patsy Najar, Project Manager (505) 798-6783  Patsy.Najar@state.nm.us

Contractor:

Mountain States Constructors, Inc.
3601 Pan American Freeway NE Suite 111
Albuquerque, NM 87107
(505) 292-0108


US 550: Milepost 3.15 to 3.65 and NM 347 milepost 29.4 to 29.53 

Scope: Installation of traffic signal and roadway lighting at Paseo Del Volcan and US 550. 

Approximate Cost: $299,555.00
Anticipated Start DateMid-Summer  2016
Expected Completion Date: Late-Summer  2016

Project Sponsor:
NMDOT
Patsy Najar, Project Manager (505) 798-6783  Patsy.Najar@state.nm.us

Contractor: MWI, Inc.
2303 Phoenix Ave NE
Albuquerque, NM 87107
PH:  (505) 508-0654


I-40 at Unser Boulevard (Milepost 153.74 to 154.35)  A 300076

Scope: Sound wall construction and lighting.

Approximate Cost: $2.54 million
Anticipated Start Date: April 2016
Expected Completion Date: August 2016

Project Sponsor:
NMDOT
Patsy Najar, Project Manager (505) 798-6783 patsy.najar@state.nm.us

Contractor:
AUI, Inc
7420 Reading Avenue SE
Albuquerque, NM 87105
(505) 242-4848


NM 314, Railroad Overpass
Scope: Bridge replacement over BNSF railroad

Approximate Cost: $9.1 million
Anticipated Start Date: April 2015 with suspension from Nov. 2015 to January 2016
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Chris Sinclair, Project Manager 505-798-6754 chris.sinclair@state.nm.us

Contractor:
El Terrero Construction, LLC
4824 Huron Drive
Rio Rancho, NM 87144
(505) 896-3864


I-25, North of Broadway to South of Rio Bravo
Scope: Roadway and Bridge Reconstruction

Approximate Cost: $20.2 million
Anticipated Start Date: Spring 2015
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
Mountain States Constructors, Inc
3601 Pan American Frwy NE # 111
Albuquerque, NM 87119
(505) 292-0108


Public Documents

I-40, Eastbound Louisiana Boulevard Interchange, MP 162.5 to MP 163.5

Scope:
Reconstruction of concrete pavement entrance and exit ramps, pavement reconstruction on Louisiana Boulevard, addition of 3rd  left turn lane for eastbound to northbound traffic at eastbound off-ramp.

Approximate Cost: $3.7 million
Anticipated Start Date: Winter 2016
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
Interstate Highway Construction, Inc
P.O. Box 9172 Albuquerque, NM 87119
Office (505) 212-7007
www.IHCQuality.com