Projects In The Design Phase

(CN 6100970/6100971) US 491 and Carbon Coal Road Improvement Project Public Meeting Presentation (McKinley County)

Project Information:
The New Mexico Department of Transportation (NMDOT), in cooperation with McKinley County, proposes to reconstruct Carbon Coal Road into a four-lane paved roadway with 12-foot (ft) lanes and 8-ft shoulders. The project also includes realignment of the east end of Carbon Coal Road to intersect with US 491 at the existing location of South Chino Loop, realignment of South Chino Loop to intersect with Carbon Coal Road as a T-intersection, and improvements to US 491 and 9th Street at the intersection to accommodate traffic flow, address pavement deficiencies and various other improvements.

The project is 5.2 miles in length, with the Beginning of Project (BOP) at the intersection of Carbon Coal Road and Mentmore Road and the End of Project (EOP) on 9th Street 0.14 miles southeast of its intersection with US 491. The east side of the project area includes the intersection of Carbon Coal Road with US 491, a major highway connecting Interstate 40 to Shiprock. At the west side of the project area, Carbon Coal Road terminates at Mentmore Road, a small roadway that leads to the community of Mentmore to the south and a rail loop, truck-to-rail transport facility to the north. The project area is located north of the city of Gallup, in McKinley County, New Mexico (see map below).


This project is financed by the NMDOT with state funds and has been assigned NMDOT Project and Control Number (CN) 6100970 for project design and CN 6100971 for construction.

PUBLIC INVOLVEMENT:  A Virtual Public Meeting is scheduled for August 19, 2020.  During the meeting, project team members will present the proposed improvements and provide an opportunity to answer questions and receive comments.  If you are unable to attend the virtual meeting, please contact Eric Johnson to request a copy of the presentation and comment form.

HOW TO PARTICIPATE:
Wednesday August 19, 2020, scheduled from 6:30 p.m. to 8:30 p.m. (MDT)
LOG-IN INSTRUCTIONS:  
If joining the meeting from a computer, tablet, or smartphone, you may start by clicking access.live/nmdot
CALL-IN INSTRUCTIONS:
 1-877-229-8493, ID code 119649

HOW TO PROVIDE INPUT:
Please participate in the meeting question/comment session or submit comments by phone, mail, or email by September 1, 2020.

Email: jfredine@parametrix.com 
Mail: 
Jeff Fredine,
        c/o Parametrix
        9600 San Mateo Blvd NE Albuquerque, NM 87113

NMDOT Contact:
Luke Smith
,
NMDOT Project Development Engineer
Phone: 505-373-7411

Project Documents:
Online Presentation
Comment Form

(CN 6100670) NM 566 Bridge Replacement Public Meeting Presentation (Churchrock, McKinley County)

Key Project Objectives

  • Replace bridge
  • Address traffic and safety issues
  • Provide pedestrian accessibility
  • Avoid right-of-way impacts
  • Maintain traffic during construction

Schedule

  • Scoping Report, July 2019
  • Preliminary design, Feb. 2020
  • Final design, July 2021
  • Construction beginning early 2022

Project Public Involvement Meeting October 23, 2019

Public Meeting - Comment Sheet

Virtual Public Meeting December 2, 2020

(CN 6101091) NM 53 Drainage Improvements Public Meeting Presentation (McKinley County)

Key Project Objectives

  • Construct new storm runoff conveyance ditches upstream of highway
  • Construct new sediment retention basins upstream of highway
  • Upgrade the existing drainage structures
  • Provide access for maintenance for Zuni Pueblo and NMDOT
  • Replace signing and striping based on condition of existing signs and striping                
  • Maintain traffic during construction

Schedule

  • Finalize Plans in Summer 2021
  • Construction beginning Spring 2022

Project Public Involvement Meeting October 26, 2020

Public Meeting - Comment Sheet



Projects In The Construction Phase

(CN 9900801) I-40, MP 8.200 - 131.00 (Cibola & McKinley Counties)

Scope:  Metal Guardrail Installation

Project Cost:  $6.1 Million

Project Sponsor:
NMDOT
Robert Darby, Project Manager (505) 285-8145

Contractor:
J-H Supply
2132 Osuna NE
Albuquerque, NM 87113
(505) 344-6006

(CN 6101040) NM 4, MP 18.5 - 19.0 (Jemez, Sandoval County)

Scope:  Bridge Replacement & Roadway Reconstruction

Project Cost:  $5.6 Million

Project Sponsor:
NMDOT
Robert Darby, Project Manager (505) 240-1836

Contractor:
Structures Inc.
4 Inverness Court East, Suite 250
Englewood, CO 80112
(303) 770-7878

(CN 9900811) I-40, MP 17.100 - 40.00 (McKinley County)

Scope:  Metal Guardrail Installation

Project Cost:  $5.7 Million

Project Sponsor:
NMDOT
Robert Darby, Project Manager (505) 240-1836

Contractor:
Valley Fence Company
P.O. Box 12312
Albuquerque, NM 87195
(505) 877-1155

(CN 6101131) I-40, MP 4.730 - 5.060 (Manuelito, McKinley County)

Scope:  Bridge Replacement & Roadway Reconstruction

Project Cost:  $14.2 Million

Project Sponsor:
NMDOT
DeWyett Shirley, Project Manager (505) 231-7799

Contractor:
AUI, Inc.
P.O. Box 9825
Albuquerque, NM 87105
(505) 242-4848

(CN 6101271) US 491, MP 32.733 - 37.076 (Buffalo Springs, McKinley & San Juan Counties)

Scope:  Roadway Rehabilitation

Project Cost:  $6.2 Million

Project Sponsor:
NMDOT
DeWyett Shirley, Project Manager (505) 231-7799

Contractor:
Fisher Sand & Gravel, New Mexico Incorporated
30A Frontage Rd., East, P.O. Box 2340
Placitas, NM 87043
(505) 867-2600

(CN 6101272) US 491, MP 61.760 - 68.106 (McKinley & San Juan Counties)

Scope:  Roadway Rehabilitation

Project Cost:  $12.8 Million 

Project Sponsor:
NMDOT
DeWyett Shirley, Project Manager (505) 231-7799

Contractor:
Fisher Sand & Gravel, New Mexico Incorporated
30A Frontage Rd., East, P.O. Box 2340
Placitas, NM 87043
(505) 867-2600

(CN 6100902) I-40, MP 39.9 - 42.5 (Coolidge, McKinley County)

Scope:  Roadway Reconstruction

Project Cost:  $12.6 Million

Project Sponsor:
NMDOT
Jeremy Madrid, Project Manager (505) 240-1678

Contractor:
FNF Construction, Inc.
115 S. 48th Street
Tempe, AZ 85281
(480) 784-2910

(CN 6100782) US 491, MP 40.500 - 42.000 (Naschitti, San Juan County)

Scope:  Lighting

Project Cost:  $492,975.00 

Project Sponsor:
NMDOT
Jeremy Madrid, Project Manager (505) 240-1678

Contractor:
Bixby Electric, Inc.
521 Wheeler Ave., SE
Albuquerque, NM 87102
(505) 842-5384

(CN 6100904) I-40, MP 37.700 - 40.300 (Ciniza, McKinley County)

Scope:  Roadway Reconstruction, CBC Extensions

Project Cost:  $TBD

Project Sponsor:
NMDOT
Jeremy Madrid, Project Manager (505) 240-1678

Contractor:
To Be Awarded